action needed
The package has not entered testing even though the delay is over
normal
The package has not entered testing even though the 10-day delay is over.
Check why.
testing migrations
-
excuses:
- Migrates after: hueplusplus
- Migration status for openrgb (- to 0.9+git20250413+ds-1): BLOCKED: Needs an approval (either due to a freeze, the source suite or a manual hint)
- Issues preventing migration:
- ∙ ∙ blocked by freeze: is not in testing
- ∙ ∙ Build-Depends(-Arch): openrgb hueplusplus (not considered)
- ∙ ∙ Depends: openrgb hueplusplus (not considered)
- Additional info:
- ∙ ∙ Piuparts tested OK - http://piuparts.debian.org/sid/source/o/openrgb.html
- ∙ ∙ New but not reproducible on amd64 - info ♻
- ∙ ∙ New but not reproducible on arm64 - info ♻
- ∙ ∙ Waiting for reproducibility test results on armhf - info ♻
- ∙ ∙ New but not reproducible on i386 - info ♻
- ∙ ∙ 11 days old (needed 10 days)
- Not considered